The Sid-Vale-Railway. Our New N Gauge DCC controlled layout 2021-22
NEWS Update. Dec'22 saw the track laying on the fiddle yard side of the layout completed, plus a 'Programming Track for DCC'
The sid vale association has kindly helped with a 50-50 grant towards our new sid vale railway N gauge DCC controlled layout. The first track being laid on the 22/08/22 after extensive work has taken place over the last 6 months building the baseboards. Then adding a cork surface, and most important providing a method of working from the top to align all the twelve baseboards without having to clamber underneath to assemble the boards at each meeting.
Our New Z21 DCC controller was tried out for the first time in August 2022, with a test train running around our test track, with at least three members having 'control' using there own mobile phones to guide the train around the tracks. More information and pictures will be added to this page.
The sid vale association has kindly helped with a 50-50 grant towards our new sid vale railway N gauge DCC controlled layout. The first track being laid on the 22/08/22 after extensive work has taken place over the last 6 months building the baseboards. Then adding a cork surface, and most important providing a method of working from the top to align all the twelve baseboards without having to clamber underneath to assemble the boards at each meeting.
Our New Z21 DCC controller was tried out for the first time in August 2022, with a test train running around our test track, with at least three members having 'control' using there own mobile phones to guide the train around the tracks. More information and pictures will be added to this page.